Phonsaad (Phonsaard) Renewable Solar Power Project in Champasak Province Laos info by Hobo Maps - Go to Solar Power Projects Page - - - HOME

The Phonsaad (Phonsaard) Renewable Solar Power Project is located near Ban Phonsaad in Khong District, Savannakhet Province of southern Lao PDR.

The solar farm is under construction in November 2026.

Concept image below of what the completed project site may look like.

Project image below as finished.

The project is owned and developed by Chaleun Sekong Energy Company Limited (CS Energy).

Project installed capacity is 150 MW(ac) or 186 MW(dc) with annual output of about 293 GWh.

Not sure who the main contractors are or who will offtake the output after completion.

As of 15 October 2026 overall construction progress, including piling works, transformer installation, and electrical system installation, has reached approximately 76%. The project is expected to commence trial electricity generation and sales under Pre-Commercial Operation Date (Pre-COD) of 30 November 2026, followed by the commencement of official commercial electricity sales on 15 December 2026.

The solar project site location is seen at the bottom of map below not far from the Cambodian border.

The project will cover about 229 hectares.

The project utilizes 720-watt bifacial solar panels, each rated at 720 Wp. These modules are capable of capturing solar radiation from both the front and rear surfaces, thereby enhancing overall electricity generation. The panels are ground-mounted using a fixed-tilt system at an angle of 11 degrees.

The panels are designed to maximize the site’s high solar irradiation potential with average annual solar irradiation of approximately 1,850 kWh per square meter per year, equivalent to an average of approximately 5.07 kWh per square meter per day.

Project info image below.

Solar panel construction site images below as of October 2026.

The solar modules are installed at a fixed tilt angle of 11 degrees and are integrated with a 45 MWh Battery Energy Storage System (BESS).

The project has been designed with an intelligent Energy Management System (EMS) integrated with a Weather and Power Forecasting System. These systems enable the project to forecast electricity generation in advance and optimize the planning and control of power production, as well as the charging and discharging operations of the BESS. The coordinated operation of these systems enhances flexibility in energy management, reduces fluctuations in power output and contributes to greater stability and reliability in the delivery of electricity to the power grid.

With its strong solar energy potential and the application of advanced technologies, the project is expected to generate approximately 293 GWh of electricity per year, making an important contribution to the promotion of clean energy utilization and sustainable energy development.

Solar panel construction site images below as of September 2026.

 

 

 

Transformer image below: